CONVENTION: DIMENSIONS TO GRID CENTRE LINES. RIDGE LINE SINGLE PRINCIPAL EVENT MARQUEE HALL CLEAR SPAN: 80'-0" [24.384 m] FRONTAGE × 150'-0" [45.720 m] DEPTH TOTAL CLEAR ENCLOSED HALL AREA: 12,000 SQ FT (1,114.8 SQ M) 1 2 3 4 5 6 7 1 2 3 4 5 6 7 A B C D E A B C D E GRID A/1 = LOCAL E 0.000, N 0.000 (SETTING-OUT DATUM ORIGIN) 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" 25'-0" HALL LENGTH 150'-0" 20'-0" 20'-0" 20'-0" 20'-0" OVERALL CLEAR WIDTH 80'-0" CRITICAL PROJECT HOLD NOTE — ELEVATIONS & LEVELS LEVELS HELD. L-00 = FFL = +/-0.000 m is PROVISIONAL and NOT tied to any site or national datum. All level elevations are HELD pending RFI-ARC-CHK-004 (no topographic survey received; no setting-out, excavation or foundation level may be taken from this sheet) and the geotech hold on sub-base, pad-footing and eaves/haunch/parapet levels. Levels will be added only on verified inputs. Do not scale or set out from this sheet. STATUS SUMMARY OF LEVEL DEPENDENCIES: • RFI-ARC-CHK-004: Topographic and boundary survey pending client issue. • Geotechnical Hold: Sub-surface soil bearing capacity and pad depth unconfirmed. • Finished Floor Level (FFL): Local benchmark +0.000 m provisional datum only. • Zero spot heights or contour elevations are shown elsewhere on this document. CRITICAL SCOPE BOUNDARY NOTE — ANCILLARY FACILITIES ANCILLARY BLOCKS NOT SHOWN. Whether lobby, kitchen, washrooms, bridal/VIP suites, service blocks, stores, plant, stairs, ramps, canopies, parking, landscape or boundary works are inside or outside the 80'-0" x 150'-0" principal rectangle is UNCONFIRMED by the client. Raised as RFI-UAS009-001 (Critical). This sheet shows ONLY the single principal marquee rectangle and the frozen grid. No such element may be added without verified client confirmation. UNCONFIRMED SCOPE ITEMS (SUBJECT TO RFI-UAS009-001): • Entrance Portico & Reception Lobby • Commercial Kitchen & Catering Annex • Guest Restrooms & Luxury Washrooms • Bridal Suite & VIP Lounge Modules • MEP Plant Rooms, Generators, HVAC Chiller Units & Service Ramps GENERAL NOTES & REFERENCE SPECIFICATIONS: 1. THIS DRAWING IS PREPARED AS A PRINCIPAL GA PLAN SHOWING ONLY THE FROZEN GRID DATUM (UAS-AD-003 / UAS-004-CDE-003 / UAS-A-065). 2. ALL GRID LINES ARE CENTRED ON PRIMARY PORTAL STRUCTURAL MEMBERS. BAY SPACINGS: 4 BAYS @ 20'-0" = 80'-0"; 6 BAYS @ 25'-0" = 150'-0". 3. STRUCTURAL STEEL PORTAL FRAMES AND PVC MEMBRANE ENCLOSURE TO BE MANUFACTURED TO APPROVED PROPRIETARY MARQUEE SPECIFICATIONS. 4. NO EXCAVATION, SITE PREPARATION, FOUNDATION CASTING OR FABRICATION SHALL COMMENCE PRIOR TO FORMAL RESOLUTION OF RFI-UAS009-001 AND RFI-ARC-CHK-004. 5. REGULATORY NOTICE: DO NOT SCALE FROM THIS DRAWING. ALL REGULATORY ENGINEERING CONTENT REQUIRES REVIEW AND SIGNATURE BY A QUALIFIED LOCAL HUMAN PROFESSIONAL. DRAWING SYMBOL LEGEND: Principal Marquee Boundary (0.7mm) Frozen Grid Centre Line (0.5mm) Dimension Chain w/ 45° Tick (0.18mm) Main Portal Column Pad (0.35mm) BUILT VIA ANTIGRAVITY CLI (agy) UNDER UAS-DQD-004 P01. AI-PRODUCED. NO PROFESSIONAL STAMP, SIGNATURE, APPROVAL, SURVEY, SOIL, LOAD OR CODE-COMPLIANCE FACT IS REPRESENTED. ZERO CDN. UAS ARCHITECTURE ADVANCED EVENT STRUCTURES DIVISION PROJECT: UAS Marquee 80 ft x 150 ft Working Drawings CLIENT / PROJECT CODE: UAS DEVELOPER / DESIGN-BUILD LEAD: Fusion Developers SHEET TITLE: MARQUEE PRINCIPAL GENERAL ARRANGEMENT PLAN SHEET NUMBER: UAS-A-103 REVISION: P01 ISSUE PURPOSE: FOR COORDINATION - PRINCIPAL RECTANGLE AND FROZEN GRID STATUS: PRELIMINARY - NOT FOR CONSTRUCTION DATE: 2026-08-05 SCALE @ A0: 1:150 UNITS: FEET-INCHES DRAWN BY: UAS-009 CHECKED BY: (Awaiting check) BAR SCALE 1:150 (METRES) 0 2m 4m 8m 12m 16m REVISION HISTORY Rev Date Description By Chk P01 2026-08-05 Principal marquee GA plan - 80'-0" x 150'-0" rectangle and frozen grid A-E / 1-7 per UAS-AD-003; levels and ancillary blocks held pending RFI-UAS009-001 & RFI-ARC-CHK-004. UAS-009 KEY PLAN PROJECT SITE BOUNDARY (TBC BY SURVEY) 80' × 150' HALL (THIS SHEET) GRID A-E / 1-7 N N - SITE NORTH TO BE CONFIRMED BY VERIFIED SURVEY IMPORTANT REGULATORY NOTICE Do not scale from this drawing. All regulated engineering content requires review and signature by a qualified local human professional before authority submission, procurement, fabrication or construction. [ NO PROFESSIONAL STAMP / SEAL / SIGNATURE ] Awaiting independent check & local PE sign-off